Work study At A Central Products Diary
| Author(s) | : | Akhil S Babu, Prof R Rajesh |
| Institution | : | Industrial Engineering and management, RIT College, Pampady |
| Published In | : | Vol. 6, Issue 5 — May 2019 |
| Page No. | : | 165-169 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
Alappuzha Dairy is directly managed by the Kerala Co-operative Milk Marketing Federation. In Alappuzhadistrict, dairy constructed under OF II with a capacity of 60,000 LPD was later expanded to 1 lakh LPD. The currentproblem faced by Alappuzha Milma is the lack of standards at production department. Also, there is a need for assessingthe current manpower strength in the production department. For solving the problems mentioned above there is a needfor conducting a work study. Work measurement technique which is going to be used is time study. Work sampling willbe applied for computing work standards. Appropriate relaxation allowances will be incorporated. The manpowerrequired for each of the processes per shift will be found out from the standard time obtained i.e. the total work volumeper shift is found out using the standard time and using the time available for each worker per shift the manpowerrequired per shift will be found.
Akhil S Babu, Prof R Rajesh, “Work study At A Central Products Diary”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 6, Issue 5, pp. 165-169, May 2019.