🕔 Call For Paper — Vol. 13 | Issue 8 | August 2026 | Deadline: 30-Aug-2026
Track Paper Submit Paper Home
📢 NOTICE
📢 Call for Papers — Volume 13, Issue 8 (August 2026) | Submission Deadline: August 31, 2026 | Rapid peer review: 2–3 days | Impact Factor: 7.37 (SJIF 2026)

Paper Details

📄 IJAERD-OJS-4221

PAVEMENT DESIGN OF KARCHELIYA-DEDVASAN ROAD-A DPR BASED APPROACH

Author(s):Nehal Chaudhari, Nidhi Randeria
Institution:PG Students M.Tech in Construction Management M.I.T. Art, Design& Technology University, Pune, Maharastra India
Published In:Vol. 4, Issue 11 — November 2017
Page No.:885-898
Domain:Engineering
Type:Research Paper
ISSN (Online):2348-4470
ISSN (Print):2348-6406
Abstract

This paper involves widening and strengthening of road network starts from Karcheliya-Bartaad -Kharvan-Dedvasan inMahuvaTaluka, Surat District, and Gujarat. The path is 0/0 to 9/45 km long and 3.75 m wide at present. The proposed width of the road isto convert the existing road from 3.75 m to 7.00 m. The work includes topographic survey, geotechnical investigations, traffic survey,earthwork calculations, geometric design of elements, drainage design and protection wall required as per standards to prepare adetailed project report. The soil of the area consists of black cotton soil that needs stabilization by using admixtures.The outcome of thestudy improvesthe strength and drainage condition of the road as well as the smooth flow of vehicles as a part of our study. The cost ofoverall road section is Rs.7,55,70,168.04.

🗎 Download PDF 🏆 Get Certificate
🕮 How to Cite

Nehal Chaudhari, Nidhi Randeria, “PAVEMENT DESIGN OF KARCHELIYA-DEDVASAN ROAD-A DPR BASED APPROACH”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 4, Issue 11, pp. 885-898, November 2017.

Related Papers

📄 Submit Your Paper

Open Access • Peer Reviewed • CrossRef DOI
UGC Approved • Monthly Publication

Submit Now →
📅 Submission Deadline
30 Aug 2026
Vol. 13 | Issue 8
August 2026