Automatic synchronization and power factor rectification of power lines
| Author(s) | : | Monika Mandavi, Monika Tanjay, Dr. Abhishek Verma |
| Institution | : | Dept. of Electrical & Electronics Engg., Bhilai Institute of Technology, Durg, India |
| Published In | : | Vol. 4, Issue 5 — May 2017 |
| Page No. | : | 661-664 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
In distribution section of power system the power synchronizing and power factor rectification is a mainfactor analysed by the survey report to decrease the commercial as well as technical loss occurred in power distribution.The commercial loss is that whenever the power get lost by manufacturer, the distributor has to paid the power lossamount to the industrial subscriber through law of justice, in order to overcome this with the help of technical andcommercial support, this project helps a lot. In this project the delay time of manual synchronization which is 1 to 2 hrs.can be reduced to 3-4 second as well as the power and cycle losses occurred in distribution after synchronization can berectified by auto stabilizing method and regenerating of pulses so that losses can be vanished and continuity of powersupply can be maintained. This system can also be implemented whenever 3, 4 feeder are connected simultaneously forpower feeding in hospitals, bus stand and government sector etc
Monika Mandavi, Monika Tanjay, Dr. Abhishek Verma, “Automatic synchronization and power factor rectification of power lines”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 4, Issue 5, pp. 661-664, May 2017.








