📄 IJAERD-OJS-1045

AUTOMATION OF CONVENTIONAL TRANSMISSION SUBSTATION USING SCADA

Author(s):Abhishek M
Institution:Industrial Automation Engineering, VTU Post Graduation Center, Regional Office Campus, Mysuru
Published In:Vol. 2, Issue 11 — November 2015
Page No.:95-103
Domain:Engineering
Type:Research Paper
ISSN (Online):2348-4470
ISSN (Print):2348-6406
Abstract

This paper discusses implementation of the next generation solution for power system control and monitoring.Due to rapid development in automation system, the remote operation, control and monitoring can be performed easilyby adopting it to the earlier conventional power systems. This can be achieved by integration of conventional systemsand modern technology SCADA. This study is about the automation of substation by integrating the existing conventionalsubstation devices with new networked infrastructure SCADA which can perform automatic industrial tasks such as dataacquisition, device control, monitoring and event recording of the overall transmission system network. This combinationof technologies empowers a highly reliable, self-healing (auto-restoration) power system that responds rapidly to realtime events with appropriate actions. Automation does not just replace manual procedures but permits the power systemto operate in a most efficient and optimal way, based on accurate information provided in a timely manner to thedecision-making applications and devices. The daily operation, load management and system faults are monitored by theSCADA which improves the performance of overall transmission systems.

🗎 Download PDF 🏆 Get Certificate
🕮 How to Cite

Abhishek M, “AUTOMATION OF CONVENTIONAL TRANSMISSION SUBSTATION USING SCADA”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 2, Issue 11, pp. 95-103, November 2015.

Related Papers

📄 Submit Your Paper

Open Access • Peer Reviewed • CrossRef DOI
UGC Approved • Monthly Publication

Submit Now →
📅 Submission Deadline
26 Oct 2026
Vol. 13 | Issue 10
October-2026