Start-up Analysis of 125MW Steam Turbine at Different Condition
Keywords:
Temperature, Pressure, Load, Time, StartupAbstract
One major challenge in today’s traditional power generation technology lies in meeting the rapidly
changing yardsticks of economics and environmental guidelines. Turbine is very sensitive part of power plant and also
very costly, so require taking care about it very essential. A long and trouble-free operation of modern turbine groups, is
for the mostly depend upon a proper start-up and shut down activity. In recent times, LP blades of a steam turbine are
generally found to be more susceptible to failure than IP (intermediate pressure) and HP (high pressure) blades. In this
paper, different startup condition of turbine and for that time taken by steam turbine is studied.