Start-up Analysis of 125MW Steam Turbine at Different Condition

Authors

  • Mali, S.D Mechanical Engineering Department, ACET, Ahmedbad
  • Rathod, G.P Mechanical Engineering Department, LDRPITR, Gandhinagar
  • Joshi, D.H Mechanical Engineering Department, LDRPITR, Gandhinagar

Keywords:

Temperature, Pressure, Load, Time, Startup

Abstract

One major challenge in today’s traditional power generation technology lies in meeting the rapidly
changing yardsticks of economics and environmental guidelines. Turbine is very sensitive part of power plant and also
very costly, so require taking care about it very essential. A long and trouble-free operation of modern turbine groups, is
for the mostly depend upon a proper start-up and shut down activity. In recent times, LP blades of a steam turbine are
generally found to be more susceptible to failure than IP (intermediate pressure) and HP (high pressure) blades. In this
paper, different startup condition of turbine and for that time taken by steam turbine is studied.

Published

2015-12-25

How to Cite

Mali, S.D, Rathod, G.P, & Joshi, D.H. (2015). Start-up Analysis of 125MW Steam Turbine at Different Condition. International Journal of Advance Engineering and Research Development (IJAERD), 2(12), 60–67. Retrieved from https://www.ijaerd.org/index.php/IJAERD/article/view/5263