[1]
Mali, S.D, Rathod, G.P and Joshi, D.H 2015. Start-up Analysis of 125MW Steam Turbine at Different Condition. International Journal of Advance Engineering and Research Development (IJAERD). 2, 12 (Dec. 2015), 60–67.